Flood Risk Assessments in London For Planning Permission & Flood Mitigation
London faces a broad and complex flood risk due to its location along the tidal River Thames, its low-lying areas, and the impact of heavy rainfall and rising sea levels. The city is protected by extensive flood defences, including the Thames Barrier and embankments, but extreme weather events and climate change increase the likelihood of both tidal and surface water flooding. Urban development and the large amount of paved surfaces reduce natural drainage, meaning that intense rainfall can overwhelm drainage systems. While major flood infrastructure significantly reduces the risk of flooding, residual risks to proposed developments in the city remain.
Assess Flood Risk in London – Desk studies allow the risk to developments in London to be appropriately assessed. These comprise in-depth research of flood risk across London, including analysis of modelling data obtained from the Environment Agency, Digital Terrain Model (DTM) LiDAR topographical surveys, Strategic Flood Risk Assessments and guidance from London local planning authorities.
Support Planning Applications – To obtain planning permission for a development in a Flood Zone or Critical Drainage Area in London, a flood risk assessment will be required to determine the risk to the proposed development. This may also involve carrying out a Sequential Test and Exception Test in accordance with local authority requirements.
Flood Mitigation & Sustainable Drainage – Where a development in London is found to be at risk from flooding, either from river, tidal, surface water, groundwater, sewer or reservoir flooding, appropriate mitigation measures to protect the proposed development and any future occupants will be required. If a proposed development in London, particularly in a Critical Drainage Area, increases surface water runoff rates by introducing new impermeable surface area, this must also be addressed by proposing suitable Sustainable Drainage Systems (SuDS) to reduce runoff rates and volumes, where possible.
Ask a question →Our Flood Risk Assessment Services in London
Preliminary Flood Risk Assessment – When developing land in London, our Preliminary Flood Risk Assessments allow you to understand the risk to your development from flooding from a number of sources including river, tidal, surface water, groundwater, sewer and reservoir flooding allowing you to understand the implications for your site.
Our Preliminary Flood Risk Assessments use LiDAR and modelling data from the Environment Agency as well as information from local authority Strategy Flood Risk Assessments to derive flood levels on your site and determine the requirement for mitigation. Environment Agency surface water, groundwater and reservoir flood mapping is also used, along with information from the British Geological Survey and Thames Water, to assess the risk to your site from all sources of flooding and provide a comprehensive assessment of the flood risk to your development.
Detailed Flood Risk Assessment – On sites in London with a complex or particularly significant flood risk, a Detailed Flood Risk Assessment may be required. This may also be required in areas close to smaller tributaries of the River Thames where local flood data does not exist and site specific modelling is required to fill in the gaps.
Flood Mitigation Options Appraisal – When a risk from flooding has been identified, mitigation will be required to ensure that the development is safe for its lifetime without increasing flood risk elsewhere. For new build developments in London, this may simply involve raising floor levels while conversions and extensions may require retrofit solutions such as flood doors or flood barriers. Our Flood Mitigation Options Appraisals include a detailed evaluation of potential mitigation options followed by a strategy outlining the most appropriate mitigation options for your site and how they should be implemented.
Flood Warning & Evacuation Plan – Our London‑specific Flood Warning & Evacuation Plans set out clear procedures to protect residents and businesses from tidal Thames flooding, surface water events, sewer surcharging, and rising groundwater and include concise vulnerability assessments, safe access and egress routes, and resilience measures in accordance with local planning requirements across London boroughs.
Sustainable Drainage (SuDS) Options Appraisal – We design SuDS strategies to manage surface water flooding in London's urban areas, incorporating green infrastructure and adhering to local authority requirements. Our appraisals assist developments in positively contributing to London's flood resilience.
Flood Risk Activities Permit – We guide you through obtaining Environment Agency Flood Risk Activity Permits for works near London's main rivers, flood defences, or floodplains, ensuring compliance and reducing regulatory delays.
Contact us →When Is a Flood Risk Assessment Needed in London?
Planning Permission – A Flood Risk Assessment is often required to obtain planning permission in London because many parts of the city lie within areas identified as having a medium to high probability of flooding, particularly from the Thames, tidal surges, surface water, and overwhelmed drainage systems. Local planning authorities need clear evidence that new developments will be safe, resilient, and will not increase flood risk to surrounding areas. An assessment helps demonstrate that the proposed design includes appropriate mitigation measures, such as sustainable drainage systems (SuDS), raised floor levels, or flood‑resistant construction, and aligns with national policies in the National Planning Policy Framework (NPPF) and the London Plan. In many areas, obtaining planning permission is simply impossible without one.
Due Diligence – A flood risk assessment can also be valuable as part of due diligence in London, even when it isn't formally required for planning. Much of the city is affected by complex flood pathways—from tidal influences of the Thames to surface‑water flash flooding and ageing Victorian drainage networks—so understanding a site's true level of risk helps investors, developers, and homeowners make informed decisions. A due‑diligence assessment can highlight potential liabilities, future insurance costs, or design constraints early in the process, reducing the chance of unexpected expenses later on. It also supports long‑term resilience planning by identifying opportunities for sustainable drainage, flood‑resistant materials, or emergency access routes. Ultimately, it provides confidence that the site is appropriate for its intended use and that any flood‑related challenges are understood and manageable from the outset.
Contact us →

Where Does it Flood in London?
Flood Risk in East London (Stratford, Canary Wharf, Royal Docklands) - East London is highlighted as one of the most vulnerable regions because large parts sit within low‑lying land close to the tidal Thames and former marshland. These areas are heavily urbanised, resulting in reduced permeability and heavy reliance on drainage systems that can be easily overwhelmed during intense rainfall. Their proximity to tidal sections of the Thames further increases their susceptibility as when high tides combine with storm surges or heavy rainfall, floodwater has limited space to disperse.
Flood Risk in West London Riverbank (Fulham, Hammersmith, Richmond) - West London areas such as Fulham, Hammersmith, and Richmond are also known to be at risk of flooding. These districts border the Thames where the river bends and widens, creating natural floodplains. Despite existing defences, tidal flooding remains a threat as rising sea levels increase baseline river levels in tidal rivers like the Thames, making overtopping more likely. These areas also contain old drainage networks, which increases vulnerability to surface water flooding during intense rainfall.
Flood Risk in South London (Areas north of Clapham and Brixton) - Flood modelling indicates that parts of South London above Clapham and Brixton could also be at risk of flooding. While not all of these areas sit directly on the river, the topography includes slopes and valleys that can funnel surface water during storms. When rainfall exceeds the capacity of drainage systems the resulting flash flooding can spread quickly across densely populated neighbourhoods. This is further compounded by London's ageing Victorian sewer infrastructure, which struggles to cope with modern rainfall patterns (a general issue recognised in strategic flood risk assessments).
Flood Risk in North London (River Lea Corridor) - North London's River Lea corridor, running through areas such as Stratford, Hackney Wick, and further north toward Tottenham, is at notable flood risk because it is influenced by a combination of tidal flooding from the Thames as the Lea becomes tidal in its lower reaches, fluvial flooding when heavy rainfall causes the River Lea to overtop its banks, and surface‑water flooding where intense rain overwhelms urban drainage systems. Although the area benefits from the Thames Barrier, tidal flood defences, fluvial defences, and the Lea Flood Relief Channel, residual risk remains due to sea‑level rise and increasingly extreme rainfall events, making the Lea Valley one of North London's most complex and sensitive flood‑risk areas.
Contact us →Meet Our Flood Risk Consultants
Louis Turner, Technical Director - Having graduated from the University of Nottingham with a degree in Environmental Science, Louis is recognised for his technical leadership and precision in environmental consultancy. Louis provides strategic oversight across all service areas, ensuring projects meet the highest standards of compliance, accuracy, and environmental responsibility. Louis leads the preparation of flood risk assessments, combining hydrological data, modelling, and site-specific analysis to evaluate potential hazards. His reports provide robust guidance for planning applications, helping clients mitigate flood risks and comply with Environment Agency and local authority standards.
Joe Turner, Operations Director - Providing practical expertise and a client-focused approach, Joe ensures that every project is delivered quickly, efficiently, and without unnecessary hassle. He has successfully managed a wide variety of project types across the consultancy, bringing a wealth of operational knowledge and a reputation for keeping projects on track. Joe's leadership guarantees a smooth process for clients, from initial enquiry through to final reporting. Joe manages the operational side of flood risk assessments, ensuring hydrological modelling and reporting are completed promptly and accurately. His oversight guarantees that clients receive clear, actionable guidance to satisfy planning conditions and mitigate flood hazards.
Richard Turner, Director - With over 30 years of experience in site development, he provides invaluable insight into pragmatic solutions that balance costs, practicalities, and client objectives. Richard has a detailed understanding of building regulations and a clear sense of what is and isn't possible on site, making him a trusted advisor for developments of all sizes. Richard's background in site development allows him to assess flood risk with a pragmatic eye, ensuring that proposed mitigation measures are realistic, cost sensitive, and suitable for the specific site conditions.
Request A Flood Risk Assessment
Contact us for an informal discussion about your requirements or, if your requirements are more complex, a more formal consultation may be necessary. Following initial consultation we can provide an outline proposal detailing how we can help and the costs involved. If you're looking for more information about our services or our company then complete the below contact form and we will endeavour to respond to your enquiry in a timely manner, alternatively, give us a call on 0800 433 2906 and our experienced consultants can provide actionable advice and guidance.
If you need help or have a question, let us know and we will endeavour to respond same day. By sending this form you agreeing to our Privacy Policy and for the personal data entered above to be saved to allow us to properly respond to your enquiry. Data is not shared with third-parties.
Frequently Asked Questions
How much does a Flood Risk Assessment cost? - Flood Risk Assessments vary in cost depending on a number of factors, primarily what work is included. The lowest cost option available is a Preliminary Flood Risk Assessment, which will involve a desk study of the site, analysing all available data from the Environment Agency, Local Planning Authority and any other flood risk assessments that may have been carried out in the area, following this, a qualitative assessment of all the potential flood risks to the site and resulting from development is conducted. Where detailed flood data is unavailable or further investigation of flood risk is recommended, a Detailed Flood Risk Assessment will be carried out, including site-specific quantitative flood modelling, to ensure reports are accurate and costs are kept to a minimum by avoiding unnecessary surveys and reports.
What is a Preliminary Flood Risk Assessment? - A Preliminary Flood Risk Assessment will include analysis of all potential sources of flooding at a site and their potential impact, taking into account a number of factors including, any proposed development and the use of the site. Often requested by the Local Planning Authority, a Preliminary Flood Risk Assessment will act as a in-depth scoping assessment to determine whether the risk of flooding at the site is acceptable or whether a more detailed assessment, including modelling and surveying site levels, is necessary.
What is a Detailed Flood Risk Assessment? - A Detailed Flood Risk Assessment is an in-depth study that focuses on surface water and river modelling to understand how flooding could impact a specific site. Unlike a standard assessment, this process uses advanced hydraulic and hydrological modelling to provide accurate predictions of flood behaviour under a range of scenarios. It is particularly important for developments where existing Environment Agency data is incomplete or does not capture the complexity of the site.
What is a Flood Mitigation Options Appraisal & Strategy? - A Flood Mitigation Options Appraisal & Strategy is a structured, site-specific assessment that identifies all feasible mitigation measures, evaluates their effectiveness, and sets out a preferred strategy for reducing flood risk. This process ensures compliance with national planning policy, supports safe and sustainable design, and gives decision-makers confidence that your development is resilient.
What is the Sequential Test? - When planning new development in England, especially in areas at risk of flooding, the planning system requires us to consider flood risk from the very start. Two key tools in this process are the Sequential Test and, where necessary, the Exception Test. These tests are part of the National Planning Policy Framework (NPPF) and help ensure that development is located and designed to minimise flood risk now and in the future. The Sequential Test is all about steering development to areas with the lowest probability of flooding. It asks a simple question: Is there a reasonably available site at lower flood risk where this development could go instead?
How to get a flood risk activities environmental permit? - The best way of obtaining an Environment Agency flood risk activities permit is to be thoroughly prepared, demonstrate that the proposed activity will be carried out in compliance with all relevant regulations, and to be responsive and professional in your interactions with the Environment Agency.
References
British Geological Society. BGS GeoIndex
Environment Agency. Flood map for planning
Environment Agency. Flood risk and coastal change
Environment Agency. Flood risk assessments: applying for planning permission